





the excavation is situated on a corner block that has a road quite close to the excavation therefor this process of retaining the walls of the basement excavation is crutial
i was able to see this process in action upon a site visit, the concrete was sprayed on the areas of the wall between the concrete columns. very interesting to see
No comments:
Post a Comment